Title |
A Study on Optimization of Block Sectioning for Step Speed Control (II) |
Keywords |
Step speed control ; beacon signaling system ; moving block ; beacon installation interval |
Abstract |
In part I, we studied only step speed control for train, the second part extended to beacon signaling system and moving block system. With the calculated braking distance in part I, part II showed how to reduce headway using the beacon signaling system and moving block system, revealed that the beacon system has a braking distance advantage for sighting allowance with compared to step speed control, proposed beacon installation interval and revealed the braking distance with moving block system being nearly approached to train pure braking distance. We compared three different train control system to decide the best signaling system for a given condition and obtained the result that three systems have a same headway near 10~13 steps speed control. |