Title |
A Restoration Automation Algorithm on a Fault in Substation of SCADA-coordinated Distribution Automation System |
Authors |
홍준호(Hong, Jun-Ho) ; 임일형(Lim, Il-Hyung) ; 이승재(Lee, Seung-Jae) ; 김태완(Kim, Tae-Wan) ; 최면송(Choi, Myeon-Song) ; 하복남(Ha, Bok-Nam) ; 이성우(Lee, Sung-Woo) |
Keywords |
Substation ; distribution automation ; Reorganization of distribution network ; Priority in loads |
Abstract |
It is impossible to take the instant action in the distribution system When fault occures in a substation because operation of the substation and the distribution system are separated. However the power system automation has been studying about unity operation and co-operation between SCADA and DAS(Distribution Automation System). In this paper proposes a new algorithm of efficiency restoration using a outage load switching to a healthy MTR a fault occurrence at a MTR in united system between DAS and SCADA. In addtion, proposed algorithm includes a outage restoration method which keeps MTR optimal capacity with reorganization of distribution network in case it can not restore outage state loads caused by shortage of healthy MTR remain capacity. In case that proposed sequence still can not complete restoration, this paper suggests a efficiency outage restoration with objective function included priority in outage loads. In the case studies, the proposed algorithm have been verified in 2 MTR and 3 MTR substation |