Title 345kV Overhead Transmission Line Collapse Analysis and Countermeasures
Authors 박재웅(Park, Jae-Ung) ; 신태우(Shin, Tai-Woo) ; 최진성(Choi, Jin-Sung) ; 최한열(Choi, Han-Yeol) ; 민병욱(Min, Byeong-Wook)
Page pp.531-535
ISSN 1975-8359
Keywords Transmission Line ; Transmission Tower ; Dust Devil ; Wind Pressure Load ; Collapse
Abstract 345kV Incheon Thermal Power Plant Transmission Line Collapse Analysis and Countermeasures. The Typhoon Galmaegi which had been formed in July 15, 2008 diminished into a tropical cyclone and cooled the air above the West Sea. The cooled air colliding with the warm inland air caused a strong whirlwind at some places in the west seaside; the whirlwind battered the 345kV Incheon Thermal Power Plant Transmission Line to be collapsed. The resistance of transmission towers against wind pressure, one of the key elements in transmission line engineering, is designed to endure the pressure corresponding to the maximum instantaneous wind speed. Before the above accident happened, no transmission line has ever been collapsed by a whirlwind. So this paper is aimed to analyze causes that collapsed 345kV Incheon Thermal Power Plant transmission line and to introduce countermeasures.