Title |
Expanding Plan Study of KRTCS-2(Korean Radio Train Control System for Conventional & High Speed Railway) |
Authors |
이강규(Lee, Kang-Gyoo) ; 최종관(Choi, Jong-gwoan) ; 성동일(Sung, Dong-Il) ; 윤학선(Yun, Hak-Sun) ; 박종원(Park, Jong-Won) ; 김유호(Kim, You-Ho) ; 이남형(Lee, Nam-Hyoung) ; 유종천(Yoo, Jong-Cheon) |
DOI |
https://doi.org/10.5370/KIEE.2017.66.3.533 |
Keywords |
Korean railway train control system ; KRTCS-2 ; ETCS Level 2 ; LET-R |
Abstract |
ERTMS/ETCS Level 2 is currently planning, making contract, constructing and operating at several lines in European well-developed railway countries different from past ten years ago, and applying extensively for purpose of its intercompatibility and operational efficiency, and economic feasibility. On the other hand, ATP system correspond to ETCS Level 1, which was domestically introduced in early 2000, has introduced, operated, and planned or constructed in national railwaynetwork, but the lines, which its improvement period is come, are being occurred starting Gyeongbu Line. Therefore, we study the consideration and construction plan by stages if LTE-R Korean Radio-based Train Control System for conventional & high-speed railway under domestic development is extensively applied as the third National Railway Network Construction Plan was announced. |