• 대한전기학회
Mobile QR Code QR CODE : The Transactions of the Korean Institute of Electrical Engineers
  • COPE
  • kcse
  • 한국과학기술단체총연합회
  • 한국학술지인용색인
  • Scopus
  • crossref
  • orcid

References

1 
Korea Power Exchange , The 7th Basic Plan for Long- term Electricity Supply and DemandGoogle Search
2 
Garver L. L., 1972, Adjusting Maintenance Scheduling to Levelize Risk, IEEE PAS-91, pp. 2057-2062DOI
3 
Zürn H. H., Quintana V. H., 1975, Generator Maintenance Scheduling via Successive Approximation Dynamic Pro- gramming, IEEE PAS-94, pp. 665-671DOI
4 
Dopazo J. F., Merrill H. M., 1975, Optimal Generator Maintenance Scheduling using Integer Programming, IEEE PAS-94, pp. 1537-1545DOI
5 
Zürn H. H., Quintana V. H., 1977, Several Objective Criteria for Optimal Generator Preventive Maintenance Scheduling, IEEE PAS-96, pp. 984-992DOI
6 
Khatib H., 1979, Maintenance Scheduling of Generating Facilities, IEEE, PAS-98, pp. 1604-1607DOI
7 
Yamayee Zia, Sidenblad K., Yoshimura Miki, 1983, A Computationally Efficient Optimal Maintenance Scheduling Method, IEEE PAS-102, pp. 330-338DOI
8 
Wang X., McDonald J. R., 1994, Modern Power System Planning, McGraw-Hill Book CompanyGoogle Search
9 
Silva E. L., Morozowski M. etc, 1995, Transmission Constrained Maintenance Scheduling of Generating Units: A Stochastic Programming Approach, IEEE Trans. on PS, Vol. 10, No. 2, pp. 695-701DOI
10 
Marwali M. K. C., Shahidehpour S. M., 1998, Integrated Generation and Transmission Maintenance Scheduling with Network Constraints, IEEE Trans. on PS, Vol. 13, No. 3, pp. 1063-1068DOI
11 
Song K. Y., Choi J. S., Kim Y. H., 년도, A Study on the Probabilistic Production Costing Simulation using Fast Hartley Transform-with considering Hydro and Pumped- Storage Plants, Proceedings of the KIEE Conference. The Korean Institute of Electrical EngineersGoogle Search
12 
Jeon Donghoon, Park Jeongje, Oh Taegon, Cho Kyeonghee, Choi Jaeseok, Baek Ungki, 2010, Assessment of the CO2 Emission Considering the Generator Maintenance Scheduling, KIEE, Vol. 59, No. 9, pp. 1507-1513DOI
13 
Park Jeongje, Choi Jaeseok, Baek Ungki, Cha Junmin, Lee Kwang Y., 2010, Flexible Maintenance Scheduling of Generation System by Multi-Probabilistic Reliability Criterion in Korea Power System, KIEE, Journal of Electrical Engineering & Technology, Vol. 5, No. 1, pp. 8-15DOI
14 
Oh Taegon, Baek Ungki, Choi JaeSeok, 2011, Stablishment of Generator Maintenance Scheduling Considering Mini- mization of CO2 Emissions, KIEE, Vol. 6, No. 4, pp. 705-710DOI
15 
Oh Taegon, Choi Jaeseok, Baek Ungki, 2011, A Daily Scheduling of Generator Maintenance using Fuzzy Set Theory combined with Genetic Algorithm, KIEE, Vol. 60, No. 7, pp. 1314-1323DOI
16 
Lee Yeonchan, Oh Ungjin, Choi Jaeseok, Cha Junmin, Choi Hongseok, Jeon Donghun, 2017, Conversion Function and Relationship of Loss of Load Expectation Indices on Two Kinds of Load Duration Curve, The Transactions of the Korean Institute of Electrical Engineers, Vol. 66, No. 3, pp. 475-485Google Search